ESIG Large Loads Workshop

Date

  • 28 September 2026
  • Time: 10:00 – 18:00
  • Room: Douro II

Information

ESIG (Energy System Integration Group) is organising a workshop on electric systems planning and reliable operations with large loads. This event is organized in cooperation with Energynautics.

The workshop will be held at the venue of the 25th Wind & Solar Integration Workshop, the Pestana Douro Riverside.

Workshop Details

The workshop is planned to address the evolving challenges of electric systems planning and the reliable operation of large loads. As significant new demand sources—ranging from large-scale data centers to other industrial and transportation loads—enter interconnection queues, the exchange of technical knowledge between European and North American stakeholders becomes increasingly essential.

Anticipated sessions of this one day workshop include:

  • Load Growth Forecasts and Flexibility for planning
  • Connection Processes and Network Upgrades
  • Technical Reliability and Grid Codes and system stability studies

Join us for a cocktail reception in the evening following a day full of inspiring talks, insights, and exhange.

Workshop Agenda (draft)

09:00

START REGISTRATION

09:30

WELCOME COFFEE

10:00

Introduction Session – Keynotes
Session chair: Alejandro Moreno (ESIG, USA)

Keynote Presentations:

  • Data Centres and the Power System: expected trends, challenges and opportunities
    Orestis Vantzos (on behalf of ENTSO-E)
  • Reliable Integration of Large Computational Loads – Ensuring North America’s Grid Reliability
    Aung Thant (NERC, USA)
  • Anuja Ratnayake (EPRI, USA)
11:15

COFFEE BREAK

11:30

Session 1 – Load Growth Forecasts and Flexibility for Planning
Session chair: Hannele Holttinen (recognis, Finland)

How do planners and operators forecast and plan for large new loads, and what flexibility can those loads actually be counted on to provide? This session examines forecasting practice, the resource-adequacy implications of concentrated load growth, and the difference between flexibility that is offered and flexibility that can be planned around.

Presentations:

  • Forecasting for Large Loads Across the U.S.: Current Practices and Recommendations
    John D. Wilson (Grid Strategies, USA)
  • Flexibility Framework: A Practical Approach to Operationalizing Load Flexibility
    Irene Danti Lopez (EPRI, France)
  • Reflections and insights from Demand connections reform in GB (tbc)
    James Whiteford (NESO, United Kingdom)
  • Emerald AI and the Disappearing Data Center: Time Clocks, Computation Flex, and Grid Rules
    Arushi Sharma Frank (Luminary Strategies, USA)

Discussion

13:00

LUNCH

14:00

Session 2 – Connection Processes and Network Upgrades
Session chair: Amy Rose (Energynautics, Germany)

Large loads are requesting connection to the grid faster than their impact on the grid can be assessed. This session looks at how system operators and utilities are managing connection queues and connection studies, and how they plan the network upgrades that new large loads require.

Presentations:

  • Large Loads Connection Process and Studies​
    Vinay Sewdien (Krios Infrastructure, Netherlands)
  • ERCOT’s Evolution in Large Load Transmission Planning, Flexibility, and Co-Location
    Jeff Billo (ERCOT, USA)
  • Reflections and insights from Demand connections reform in GB
    James Whiteford (NESO, United Kingdom)
  • Using BESS and Standardized Metrics to Support Large Load Connections
    Benjamin Braun (Fluence Energy, Germany)

Discussion

15:40

COFFEE BREAK

16:00

Session 3 Technical Reliability and Grid Codes
Session chair:  Alex Shattuck (ESIG, USA)

The rapid penetration of large loads significantly changes system performance during both normal and abnormal conditions as well as the assumptions necessary to perform studies that help ensure system stability in this new paradigm. The performance and modeling requirements needed to account for this paradigm shift are still being developed worldwide. This session covers the reliability impacts of large loads and the regulatory efforts to ensure large load performance, and modeling requirements emerging in the US and Europe can reliably integrate them.

Presentations:

  • Large Load Performance Requirements in North America
    Julia Matevosyan (ESIG, USA)
  • Requirements for large demand facilities in Finland – What is needed and why?
    Lasse Linnamaa (Fingrid, Finland)
  • Performance Requirements for Large Loads in Ireland
    Taulant Kerci (EirGrid, Ireland)
  • Balancing Grid Code Evolution with Large Load Operational Considerations
    Liam Morrissey (Google, Ireland)
  • Data Centres Load Behaviour with the Upcoming Connection Requirements
    Önder Polat (WSP UK, United Kingdom)

Discussion

17:40

General discussion – Summary

18:30

COCKTAIL RECEPTION

Participation Fees & Registration

  • The ESIG Large Loads Workshop is not included in the general participation fee of the Wind & Solar Integration Workshop.
  • The registration for the ESIG Large Loads Workshop includes coffee breaks, lunch and networking cocktail.
  • Register here
  • Early Bird Discounts: Available for regular participants until 15 July 2026.
  • Speakers pay a discounted fee.
  • Students: A limited number of free tickets available. Proof has to be provided to registration@integrationworkshops.org before starting the online registration procedure. Find more information on Tickets page

Venue, Travel & Accommodation

For more information regarding the event venue, how to get there, and hotel options visit:

About the Organizer