ESIG Large Loads Workshop
Date
- 28 September 2026
- Time: 09:30 – 18:00
- Room: Douro II
Information
ESIG (Energy System Integration Group) is organising a workshop on electric systems planning and reliable operations with large loads. This event is organized in cooperation with Energynautics.
The workshop will be held at the venue of the 25th Wind & Solar Integration Workshop, the Pestana Douro Riverside.
Workshop Details
The workshop is planned to address the evolving challenges of electric systems planning and the reliable operation of large loads. As significant new demand sources—ranging from large-scale data centers to other industrial and transportation loads—enter interconnection queues, the exchange of technical knowledge between European and North American stakeholders becomes increasingly essential.
Anticipated sessions of this one day workshop include:
- Load Growth Forecasts and Flexibility for planning
- Connection Processes and Network Upgrades
- Technical Reliability and Grid Codes and system stability studies
Join us for a cocktail reception in the evening following a day full of inspiring talks, insights, and exhange.
Workshop Agenda (draft)
REGISTRATION / COFFEE
Introduction Session – Keynotes
Session chair: Alejandro Moreno (ESIG, USA)
Keynote Presentations:
- Aung Thant (NERC, USA) – tbc
- Antonio Iliceto (ENTSO-E, Europe) – tbc
COFFEE BREAK
Session 1 – Load Growth Forecasts and Flexibility for Planning
Session chair: Hannele Holttinen (recognis, Finland)
Presentations:
- James Whiteford (NESO, United Kingdom)
- John Wilson, (GridStrategies, USA)
- Invited: US Data Center Coalition (Brian George, Google)
Discussion
LUNCH
Session 2 – Connection Processes and Network Upgrades
Session chair: Amy Rose (Energynautics, Germany)
Presentations:
- REN – (Portugal) – tbc
- Jeff Billo (ERCOT, USA)
- Natalia Baudry (Google/EMEA, France)
- Antje Orths (Energinet, Denmark) – tbc
Discussion
COFFEE BREAK
Session 3 Technical Reliability and Grid Codes
Session chair: Alex Shattuck (ESIG, USA)
Presentations:
- Lasse Linnamaa (Fingrid, Finland)
- Taulant Kerci (Eirgrid, Ireland)
- Önder Polat (Black & White Engineering, United Kingdom)
- Liam Morrissey (Google/EUDCA working group, Ireland)
- Julija Matevosyan (ESIG, USA)
Discussion
General discussion – Summary
COCKTAIL RECEPTION
Participation Fees & Registration
- The ESIG Large Loads Workshop is not included in the general participation fee of the Wind & Solar Integration Workshop.
- The registration for the ESIG Large Loads Workshop includes coffee breaks, lunch and networking cocktail.
- Register here
- Early Bird Discounts: Available for regular participants until 15 July 2026.
- Speakers pay a discounted fee.
Venue, Travel & Accommodation
For more information regarding the event venue, how to get there, and hotel options visit:
