www.windintegrationworkshop.org / www.offshoreworkshop.org

The 8th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Farms. 14 - 15 October 2008, Bremen, Germany

Field Trip

Also this year's workshop will include a field trip. The field trip will take place on October 16, 2009:

Both offered tours are fully booked now.


Field trip 1 (fully booked)

Visit of the HVDC Light converter station for the BorWin1 project combined with a visit to the wind turbine manufacturer Enercon.

Field trip 2 (fully booked)

Visit of the HVDC Light converter station for the BorWin1 project combined with a visit to Bard-Engineering in Emden. Bard-Engineering is the company behind the Bard 1 Offshore wind project (400 MW at the end of 2010) using the Bard 5 MW wind turbine.

Schedule

7.30 Departure in Bremen

Lunch included

18.00 Bus returns to Bremen (Stop at Bremen Airport at around 18:00)

Please note that this is an estimate. Due to the long itinerary, the field trip organizers cannot guarantee the scheduled time of arrival.

* Details of the field trip are still in work, hence changes regarding schedule and even sites we will visit are still possible.

The number of participants will be limited. Please register for the field trip together with the workshop. The registration fee for the field trip is 85 Euro.


© 2008 Energynautics GmbH

Gigasponsors:

Megasponsors:

Media Partner:

Supported by:

Organizer: